US 17 Widening and Interchange Improvement Design-Build

Increasing capacity and relieving congestion

  • 2

    Miles

  • 2

    Construction Seasons

  • Wilmington, North Carolina

    Wilmington, North Carolina

Lead designer for design-build pursuit alleviates traffic congestion and increases roadway’s capacity on the US 17 corridor.

US 17 corridor is the main connection between Brunswick County and Wilmington and provides direct access to North Carolina beaches, including Myrtle Beach. When the North Carolina Department of Transportation (NCDOT) wanted to increase the roadway's capacity and alleviate traffic congestion, they pursued a design-build project.

As the lead design firm on the design-build team, we contributed to the design and construction of bridge and roadway improvements on approximately two miles of US 17 in Wilmington. To address challenges related to maintaining seasonal traffic, geotechnical conditions for the bridge foundation designs, and restrictive construction moratoriums, project design and construction was planned to be completed within two construction seasons. Besides roadway and bridge design, our team worked on traffic analysis, signing, signals, transportation management, proposals, and more.

The project has added more lanes on US 17 as well as replaced three of four existing bridges over intercoastal waterways and widened the remaining bridge. The roadway was widened to add auxiliary lanes along the entire length of the project, and an existing diamond interchange was converted to a double crossover diamond.

At a Glance

Offices

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top