Skip to main content
Start of main content

Clinical Scale Solid Dosage Manufacturing Facility

A dose of flexibility

  • $35M

    Construction Cost

  • 100K

    Class Clean Rooms

  • Confidential

    Confidential

Designing a solid dosage manufacturing facility for clinical supplies

Our client needed a new solid dosage manufacturing  facility for clinical supplies. After we conducted a feasibility study, we settled on an existing warehouse as top location. The site was a 30,000 square foot good manufacturing practice warehouse—and we needed to fit processing suites and offices in, while adhering to the owner’s OEB 4 guidelines.

The main floor of the warehouse was converted into 11 processing suites. The suites were constructed and configured with an eye to flexible manufacturing, allowing for multiple pieces of equipment and multiple unit operations in each space. The processing equipment was retrofitted to handle high-potency compounds, minimizing human exposure and contact. And on the second floor, office space accommodates nearly 200 employees. 

At a Glance

Offices
Client
  • Confidential
Meet Our Team

Michael Harris, Vice President, Discipline Leader, Major Projects

At the confluence of science, new technologies, and project implementation, we are helping clients produce medications to maintain and improve the health of our communities.
Michael Harris Vice President, Discipline Leader, Major Projects Read More

Kevin Merrikin, Vice President, Discipline Leader, Buildings Engineering

My focus is connecting resources from across Stantec to build teams that are able to tackle new, exciting, and challenging biopharmaceutical projects.
Kevin Merrikin Vice President, Discipline Leader, Buildings Engineering Read More

Tony Rao, Vice President, Buildings, Science & Technology Sector Leader

Unique problems require creative solutions in this industry where technology is rapidly changing and where tight schedules are the norm due to patent limitations.
Tony Rao Vice President, Buildings, Science & Technology Sector Leader Read More

Michael Harris

Vice President, Discipline Leader, Major Projects

Kevin Merrikin

Vice President, Discipline Leader, Buildings Engineering

Tony Rao

Vice President, Buildings, Science & Technology Sector Leader

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top