Twinning of Stoney Trail Bridge over the Bow River

Design and construction of a new five-span, 500-metre-long bridge over the Bow River

  • 500

    Meter Long Bridge

  • $100M

    Project Value

  • Calgary, Alberta

    Calgary, Alberta

Once completed, this new bridge will be one of the widest, highest, and longest spanning bridges crossing the Bow River in Calgary.

Our team was engaged to design the first component of the West Calgary Ring Road, known as the Bow River Bridge, and provide construction supervision as the owners engineer during project delivery. The bridge will be a five-span, 500-metre-long bridge over the Bow River, directly west of the existing Stoney Trail bridge.

The project presented several challenges: working with limited workspace onsite, configuring the long span length of the bridge, and navigating constrained accessibility. The new bridge is being built using a complex, segmentally cast-in-place, balanced cantilever method. This means the superstructure of the bridge—the part of the bridge that rests on the piers (the upright support for the structure) and abutments (substructure at the ends of a bridge span), will be built out from the six separate piers and abutments and joined together at completion. This rare construction method is coupled with in-river work to build the foundations for two piers, as well as revisions to The City of Calgary pathway network to facilitate construction.

This project is part of the final phase of construction on the Calgary Ring Road. When completed, the Calgary Ring Road will provide over 100 kilometres of freeway around the City of Calgary. 

At a Glance

Offices
Client
  • Alberta Transportation
Awards
CEA Showcase Awards, Award of Merit | Transportation Infrastructure - Transportation Structures 2024
ACI – Alberta Chapter, Awards of Excellence in Concrete | Advanced Concrete Construction, 2024
ATEC, Minister’s Award for Transportation Innovation | Construction Innovation, 2024
Meet Our Team

Andrew Boucher, Senior Associate

Good project management is based on good communication.

Myles Lewis, Bridge Engineer

Quality doesn’t happen by accident; it takes a methodical approach with great collaborative effort.

Andrew Boucher

Senior Associate

Myles Lewis

Bridge Engineer

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top