Skip to main content
Start of main content

ANZAC Bridge Maintenance Upgrade

Providing design, modeling, and assessment services to maintain the longest cable-stayed bridge in Australia

  • $58M

    Project Value (AUD)

  • 2,641

    Feet Long Structure

  • 1,132

    Feet Main Span

  • Sydney, New South Wales

    Sydney, New South Wales

Upgrading a landmark bridge across Johnstons Bay in Sydney

As the longest cable-stayed bridge in Australia, the ANZAC Bridge is an iconic landmark, stretching 805 metres (2,641 feet)with a main span of 345 metres (1,132 feet),  and towers reaching up to 120 metres (394 feet) high. Since opening, the bridge has experienced rain-wind induced vibration issues with the stay cables. The bridge needed dampers and stay surface treatment to eliminate the vibrations. In addition, the stay and deck capacity required a structural assessment for several live load cases—where any non-permanent moveable parts, contents, or users, such as traffic and people, would be weighed and tested on the structure.

As part of the Bridge Solutions Alliance, we provided the design services for the project. Working closely with our partners, we developed and verified a structural model for the bridge and were responsible for the stay and deck capacity assessment. Our team was also responsible for the bridge specific assessment of live loading using statistical analysis of recorded traffic data. As part of the bridge’s maintenance access improvements, we provided design and checking services for the temporary works and underdeck gantry improvements.

Today, users enjoy travel over a safe and reliable structure. And will do so well into the future.

At a Glance

Offices
Client
  • Bridge Solutions Alliance
  • Alliance members: Baulderstone,
  • Freyssinet Australia,
  • Sage Automation,
  • Roads and Maritime Services, NSW
Partners
  • Aurecon Australasia Pty Ltd
Meet Our Team

Ali Gorgulu, Principal Bridge Engineer

All of my best designs come from collaborating with all stakeholders, knowing what’s possible, having the right inspiration, and hard work.

James Nasr, Team Lead, Bridge Design

Achieving the best outcome for clients starts with clearly understanding their needs and putting yourself in their shoes.

Ali Gorgulu

Principal Bridge Engineer

James Nasr

Team Lead, Bridge Design

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top