T.F. Green Runway 16-34 Reconstruction

Providing design and construction phase services to rehabilitate a runway’s drainage

  • $28M

    Construction Value

  • 402

    Day Runway Closure

  • 4,481

    Feet Runway Upgrades

  • Warwick, Rhode Island

    Warwick, Rhode Island

Upgrading infrastructure to current standards for reliability and resilience

In Rhode Island, T.F. Green International Airport needed a runway upgrade to comply with U.S. Federal Aviation Administration (FAA) criteria. The Rhode Island Airport Corporation selected us to perform design and construction phase services for the Runway 16-34 reconstruction project.

For the project, our airfield design team had to consider many complicated design parameters. Runway 16-34 was originally constructed with a W-shaped cross section, which is not in accordance with current FAA criteria—the cross section included low points for drainage in a non-standard position between the runway centerline and edge lines. According to FAA recommendations, a standard runway should promote drainage all the way to the runway edges. Our final design upgraded the cross section of Runway 16-34 to a proper crown-type cross section that meets regulations. Another complication included factoring in the removal of a nine-inch-thick concrete slab that was found under the existing asphalt surface—and extended under the entire 4,481-foot (1,366-metre)-long runway.

As a result of our design and construction phase services work, the reconstructed runway will have better drainage, creating reliability and resilience for the future. 

At a Glance

Offices
Client
  • Rhode Island Airport Corporation
Meet Our Team

Dave Dargie, Vice President, Aviation Engineering Manager

It’s my job to collaborate with owners and operators to design safe and efficient airports to enhance our air travel experience.

John Henry, Senior Project Manager, Airports - Infrastructure

It’s my job to coordinate safety and design standards so that airports function safely and efficiently as part of the surrounding community and airport system plan.
John Henry Senior Project Manager, Airports - Infrastructure Read More

Gregg Cohen, Senior Environmental Project Manager

Get to know your clients—identify their styles of communication and engage. Communication is the foundation of successful project delivery.

Alexandra Myers, Aviation Designer

I’m passionate about designing and building airports so people from all over can connect.

Dave Dargie

Vice President, Aviation Engineering Manager

John Henry

Senior Project Manager, Airports - Infrastructure

Gregg Cohen

Senior Environmental Project Manager

Alexandra Myers

Aviation Designer

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top