Rehabilitating 6,500 feet of Runway 9-27 at the Logan International Airport, one of America’s busiest airports

At a Glance

  • $34.8

    Construction Value

  • 60

    Day Runway Closure for Construction

  • 6,500

    Feet of Runway Rehabilitation

Location
Boston, Massachusetts
Offices
Client
  • Massachusetts Port Authority

Logan International Airport - Rehabilitation of Runway 9-27

It might be interesting to know how many aircraft renowned air traffic controller, “Boston John” Melecio, has guided to Runway 9-27 at Boston’s Logan International Airport during his career. We know it’s a very big number, and the wear and tear of those take-offs and landings is why we were asked to provide consulting services for the Rehabilitation of Runway 9-27 Project, to upgrade this busy and important piece of pavement.

Logan is one of the busiest airports in the US—and for more than three decades, we’ve provided the Massachusetts Port Authority (Massport) airside civil and electrical design, as well as construction management services. This project covered the rehabilitation of approximately 6,500 feet of the 7,001-foot runway. Specific components of our design included runway pavement rehabilitation inclusive of paved shoulders, the intersection of Runway 15R-33L, and seven intersecting taxiways, all to be rehabilitated to beyond the Runway 9-27 safety area. Runway centerline lights, base cans, raceways, and circuitry were also removed and replaced with new. Runway edge lighting was replaced and new infrastructure for the foreign object detection systems was also included.  All work was phased and completed in a fashion that minimized impacts to airport operations without compromise to airport safety and security.

Stantec and Massport have partnered to successfully complete the three most recent Runway Rehabilitation Projects at Logan Airport while maintaining airfield and construction safety, all while minimizing impacts to airfield operations.

At a Glance

  • $34.8

    Construction Value

  • 60

    Day Runway Closure for Construction

  • 6,500

    Feet of Runway Rehabilitation

Location
Boston, Massachusetts
Offices
Client
  • Massachusetts Port Authority

Meet Our Team

Dave Dargie, Vice President, Aviation Engineering Manager

It’s my job to collaborate with owners and operators to design safe and efficient airports to enhance our air travel experience.

John Henry, Senior Project Manager, Airports - Infrastructure

It’s my job to coordinate safety and design standards so that airports function safely and efficiently as part of the surrounding community and airport system plan.
John Henry Senior Project Manager, Airports - Infrastructure Read More

Alexandra Myers, Aviation Designer

I’m passionate about designing and building airports so people from all over can connect.

Dave Dargie

Vice President, Aviation Engineering Manager

John Henry

Senior Project Manager, Airports - Infrastructure

Alexandra Myers

Aviation Designer

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top