Washington Gas Fleet Maintenance Facility

Rebuilding a fleet maintenance facility with a focus on renewable power and energy optimization

  • 11.3K

    Square Feet

  • LEED

    Gold Certified LEED-NC

  • Rockville, Maryland

    Rockville, Maryland

Fleet maintenance facility achieves LEED-NC Gold certification

After a fire destroyed a vehicle maintenance shop at their Rockland, Maryland, location, the Washington Gas Light Company (WGL) saw an opportunity to rebuild better and add to the remaining administrative office spaces. They reached out to us to help.

From the outset, we worked with WGL to verify and document that the building and all its systems and assemblies were planned, designed, installed, tested, operated, and maintained to meet LEED requirements. The program includes new locker room and restroom spaces, a fitness center, a new vehicle repair garage with larger work bays, and a wash bay for the vehicles. The sloped metal roof allows for mitigation and exhaust of compressed natural gas at the highpoint, reducing the amount of required ductwork, while providing the ideal angle for photovoltaic panels. The facility remained in operation during construction.

The completed Washington Gas Fleet Maintenance Facility exceeds the requirement for renewable power with an almost 50-kilowatt solar power system that provides 20 percent of the facility’s consumed power. Along with energy optimization, stormwater management, and indoor air quality systems, the facility has lower energy usage and costs and provides a safe, comfortable, and healthy work environment.

At a Glance

Offices
Client
  • Washington Gas Light Company
Meet Our Team

Ken Anderson, Vice President, Buildings, Civic Sector Leader

Architecture has the ability to speak to the human soul. We have a responsibility with every project to create innovative, resilient spaces that connect people to the greater spirit of living.
Ken Anderson Vice President, Buildings, Civic Sector Leader Read More

Greg Shipley, Principal, Senior Project Manager

Approaching each design with a people-first mentality and developing the project holistically sets the course for a successful project.

Ken Anderson

Vice President, Buildings, Civic Sector Leader

Greg Shipley

Principal, Senior Project Manager

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top