Skip to main content
Start of main content

Kenneth F. Burns Memorial Bridge Replacement Design-Build

Building bridges between two Massachusetts communities

  • 5

    Spans

  • Worcester-Shrewsbury, Massachusetts

    Worcester-Shrewsbury, Massachusetts

Replacing the Kenneth F. Burns bridge using a unique post-tensioning system

The communities of Shrewsbury and Worcester had a waterway in common—Lake Quinsigamond—and an old bridge that needed replacement.

As lead designer, we got to work. We designed two shallow, post-tensioned, steel-deck, arch bridges. The eastbound and westbound bridges each have five spans with a total length of nearly 870 feet. The unique post-tensioning system used about six million pounds of thrust. The bridges shine during the day, and at night, they’re lit up with a programmable, color-changing LED lighting system. The lights illuminate the arches and tall sail sculptures at both ends, and the whole area glows.

Named in honor of longtime Shrewsbury High School crew coach, police chief, and US Olympic athlete Kenneth F. Burns, the bridge has assumed icon status and has become more than just a means to get across the lake. The project also involved upgraded roads and intersections, improved accessibility for bicyclists and pedestrians, and new stormwater treatment. These features, along with the bridge, are shared between the Town of Shrewsbury and City of Worcester.

The design-build team used design and construction techniques that allowed this complex project to be finished over three months—ahead of schedule. With the team’s help, residents of Shrewsbury and Worcester now share more than just a bridge. They have new ways to make a connection.

At a Glance

Offices

New bridge lights up community

The award-winning Burns Memorial Bridge replacement has become an infrastructure icon for central Massachusetts

Meet Our Team

Jennifer Ducey, Vice President, Regional Business Leader, Transportation (US Northeast)

No two projects are exactly the same, and I’m always learning something new.
Jennifer Ducey Vice President, Regional Business Leader, Transportation (US Northeast) Read More

Paul Harrington, Vice President

A good designer needs to understand and appreciate how things are built—constructability is a critical element of our designs.

Frederick Moseley, Principal

Seeing a challenging design completed in the field gives me a satisfying sense of accomplishment.

Walt Woo, Senior Associate

It’s rewarding to have an opportunity to contribute to the communities that we live in and to be able to see the results.

Sarah Borenstein, Civil Engineer, EIT

Creating a good work ethic is key. Apply yourself at whatever you do and take every opportunity given to you.

Jennifer Ducey

Vice President, Regional Business Leader, Transportation (US Northeast)

Paul Harrington

Vice President

Frederick Moseley

Principal

Walt Woo

Senior Associate

Sarah Borenstein

Civil Engineer, EIT

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top