Skip to main content
Start of main content

Pipeline Replacement Project

Replacing an existing pipeline with a new system for safe fuel transportation

  • 320KM

    Pipeline Length

  • NPS12

    Nominal Pipe Size

  • Alberta

    Alberta

Protecting the security and integrity of project data with mTOOLS™—built by project teams for project teams

The original pipeline, built in 1970, helped fulfill fuel transportation needs. To extend the system’s useful life and continue safe transportation of refined fuel products for those communities, the pipeline replacement project was launched.

Our contribution was the engineering, procurement, and construction management (EPCM) on 320 kilometres (200 miles) of new steel pipe. The project included mainline block valve and densitometer sites along the length of pipe, pig traps at several locations, and the examination of existing pump stations and terminals to upgrade as necessary.

Using our mTOOLS™ mobile solution for data collection, our team helped improve the safe transportation of refined petroleum, meet the growing needs of consumers, contribute to the economy, and reduce tanker truck traffic on a major highway.

At a Glance

Offices
Client
  • Confidential
Meet Our Team

Dan Boyce, Senior Principal, Director, Construction Management

What I like about being a project manager is the dynamic of bringing a team together to successfully execute projects.
Dan Boyce Senior Principal, Director, Construction Management Read More

Dan Boyce

Senior Principal, Director, Construction Management

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top