Re-mediating the Detroit riverfront
The Belleview site is a former manufactured gas plant with the majority of its soils impacted with manufactured gas plant constituents and ammonia. It was decided that the best remedial approach was to excavate all impacted materials. Stantec is performing oversight and confirmation sampling for the installation of 740 foot seawall and excavation of 592,000 tons of material.
Because the site is located on the river and the existing seawall needed replaced, part of our scope included installation of a new seawall. Since excavation was necessary directly behind the seawall, which was up to 32 feet deep, the wall had to be able to handle that loading situation and allow us access for excavation.
At a Glance
We’re better together
-
Become a client
Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.